Quick answer: To use the Class 3A granny flat exemption you must send your local authority a written notification at least 14 days before work starts. Councils provide a form listing the Class 3A conditions, which you tick and sign, together with the property address and Eircode, the proposed start date, the reason for use and a drawing or photo. You do not need to wait for a decision, but you must wait 14 days.
What is the notification, in plain terms?
Class 3A is an exempted development. That means you do not apply for planning permission, but the regulations require you to tell the planning authority first. The notice gives the council the chance to see what is being built and where, and records your confirmation that you meet each condition.
Step-by-step: how to notify your council
- Check eligibility. The house must be your sole or main residence, the unit must go in the rear garden, and it must be between 32 and 45 square metres. See the full Class 3A guide.
- Find your council’s form. Dublin City, Cork City, Fingal, South Dublin, Limerick, Waterford, Galway, Wicklow, Laois, Kilkenny, Louth and Leitrim have published Class 1A/3A forms.
- Fill in the property details, including the address, Eircode and applicant or owner information.
- Enter the proposed start date, at least 14 days after the notice is received.
- State the reason for using the exemption, such as accommodation for an older relative.
- Attach a drawing, brochure or photo of the proposed structure and its location.
- Tick and sign the declarations. These cover size, boundary distance, remaining garden space, no short-term letting, no separate sale and completion by 31 December 2030.
- Submit it by the method your council specifies (email or post) and keep proof of the date.
- Wait 14 days, then start if you remain within all conditions.
What do the form’s declarations typically cover?
Council forms ask you to confirm that:
- the dwelling is not temporary (not a caravan or mobile home);
- height does not exceed 4 metres for a tiled or slated pitched roof;
- it is at least 0.6 metres from the boundary it faces;
- at least 25 square metres of private garden remains for the main house;
- there is no new vehicular or pedestrian access onto a road, and independent pedestrian or wheelchair access exists within the site;
- the unit is occupied only with the main house and will not be sold or subdivided separately;
- it will not be used for short-term letting;
- works will comply with Building Regulations, including fire safety, and Building Control Regulations.
Common mistakes to avoid
- Starting inside the 14-day window. The notice period is a legal condition.
- Overstating the floor area. Count internal floor space carefully and include other Class 3 structures in the 45 m² total.
- Ignoring Building Control. Exemption from planning is not exemption from the Building Regulations.
- Forgetting existing conditions attached to your house’s planning permission.
- Assuming a second exemption stacks. Class 1A is not available if a Class 3A unit is built.
Who should help you?
An architect, architectural technologist or engineer can confirm the design meets the conditions and prepare drawings. If you are unsure whether your site qualifies, you can also ask your council for a Section 5 declaration on exempted development.
Key takeaways
- Notify in writing, at least 14 days before starting.
- Use your council’s form; attach a drawing or photo.
- Keep proof of submission and design to Building Regulations.
FAQs
How long before starting must I notify the council?
At least 14 days before commencement.
Do I need a drawing?
Councils ask for drawings or a brochure or photo showing the proposed development.
Does the council approve the notification?
The process is notification, not application. You can start after 14 days if you meet every condition.
Can I get a binding view from the council?
You can apply for a Section 5 declaration if you want the council’s formal view on whether works are exempt.
Is there a fee?
Fees vary and depend on the council; check your authority’s website.
General information, not legal advice. Check your own council’s current forms and guidance.
Sources: Dublin City Council, Cork City Council, Fingal, Limerick, Laois, Waterford, Galway, Kilkenny, Louth, Leitrim and Wicklow notification forms (July to September 2026); South Dublin County Council S.I. 340 of 2026 text.